On the GA list, Chuck Gomes writes that controls were in place continuously during the audit period (2001) to ensure equivalent access, but the auditors were not easily able to go back to points in time in 2001 to verify that.
« ccTLD remote participation | Main | NC: Budget Committee. »
On the GA list, Chuck Gomes writes that controls were in place continuously during the audit period (2001) to ensure equivalent access, but the auditors were not easily able to go back to points in time in 2001 to verify that.
TrackBack URL for this entry:
http://log.does-not-exist.org/mt/mt-tb.cgi/248
This page contains a single entry from the blog posted on June 25, 2002 9:47 PM.
The previous post in this blog was ccTLD remote participation.
The next post in this blog is NC: Budget Committee..
Many more can be found on the main index page or by looking through the archives.